Properly replacing jaw crusher liner increases production efficiency by 40% et prolonge la vie des composants par 2-3 années. This comprehensive guide details professional techniques used insmall and large mining operations, couvrant les protocoles de sécurité, tool requirements, and precision alignment methods. Follow our 8-phase process to minimize downtime to under 4 hours per replacement.

Pre-Replacement Preparation
1. Safety Lockout Procedure
- Disconnect power supply and engage mechanical lockout
- Release hydraulic pressure (>5 minutes bleed time)
- Install fall protection for crusher pit access
2. Tool & Material Checklist
Tool | Specification |
---|---|
Hydraulic Jack | 50-ton capacity |
Torque Wrench | 300-800 Gamme n · m |
Liner Lifting Clamp | SWL 2,000kg |

Liner Replacement Process
3. Remove Worn Liners
- Loosen wedge bolts in diagonal pattern (30% torque reduction)
- Utiliserliner removal tools to break corrosion bond
- Extract upper wedges first, then side plates
4. Clean & Inspect Mounting Surface
- Remove debris with pneumatic chisel
- Check for cracks using dye penetrant
- Verify flatness (<0.5mm/m tolerance)
5. Install New Liners
Component | Torque Spec | Sequence |
---|---|---|
Mâchoire fixe | 650 N·m | Center-out |
Movable Jaw | 720 N·m | Cross pattern |
6. Alignment Verification
Use laser alignment tools to ensure:
- Parallelism <0.2mm/m
- Vertical runout <0.3mm
- Propercrushing chamber geometry

Post-Installation Procedures
7. Run-in Process
- Start with 50% feed rate for 2 heures
- Monitor vibration (<4.5 mm/s RMS)
- Retorque after 8 hours operation
8. Documentation & Analysis
- Record liner serial numbers
- Measure initial wear pattern
- Updatepredictive maintenance schedule
Common Mistakes & Solutions
Error | Consequence | Prévention |
---|---|---|
Improper torque | Liner movement | Use calibrated wrench |
Missed alignment | Premature wear | Laser verification |

Quarry Productivity Improvement
A limestone operation reduced liner replacement time from 6.5 pour 3.8 hours by:
- Implementing our 8-step process
- Using optimized liner profiles
- Training crew on crusher kinematics

Essential Tools for Efficient Replacement
- Liner handler with vacuum lift
- Infrared thermal camera (check bearing temps)
- Digital thickness gauge (wear measurement)
Precision Saves Costs
Replacing jaw crusher liner requires understanding torque specifications, alignment tolerances, and proper run-in procedures. Donc, by integrating this guide with your preventive maintenance program andequipment documentation, operations typically achieve 18-24 month liner lifecycles even in abrasive conditions.
Bureau du siège social
WhatsApp:+8615225176731
E-mail: [email protected]
Adresse: Non. 1688, Gaoke East Road, Nouveau quartier de Pudong, Shangai, Chine.
Site Internet: https://www.mill-sbm.com/
Contenu des articles
Messages récents
- Quels sont les modèles de concasseur en pierre les plus efficaces?Faire correspondre vos modèles de concasseur en pierre n'est pas seulement efficace - il s'agit de résoudre les goulots d'étranglement opérationnels. Équipement SBM China, Comme la série HP pour Hard Rock Mining ou le K3…
- Applications de broyeur à la mâchoire dans le traitement agricole du calcaireDes Prairies du Midwest aux paddies d'Asie du Sud-Est, Le calcaire écrasé respire la vie dans les terres agricoles acides - mais débloquant ses exigences potentielles à pleine mâchoires conçues pour lutter contre les formations rocheuses régionales, Équilibrer le pouvoir avec…
- Traitement du minerai d'or: Efficacité du broyeur à la mâchoireTraitement efficace du minerai d'or charnise sur des opérations de concassage précises, où les broyeurs de mâchoire convertissent les dépôts robustes en matières premières optimisées. Découvrez comment affiner ces machines pour une productivité maximale sans compromettre le site de travail…